![]() |
|
![]() | ||
|
Subject:
Civil Engineering Hydroelectric scheme initial assesment
Category: Science Asked by: jim1000-ga List Price: $4.00 |
Posted:
04 Mar 2005 14:28 PST
Expires: 07 Mar 2005 01:42 PST Question ID: 484851 |
How do i make a initial assessment of how much hydroelectric power can be taken from a river? The only data I have available is the river flow and width. |
![]() | ||
|
There is no answer at this time. |
![]() | ||
|
Subject:
Re: Civil Engineering Hydroelectric scheme initial assesment
From: sume-ga on 07 Mar 2005 01:07 PST |
power generated on hydel power plant mainly depneds on volume of pamer and the hight of water.hight of water means the level difference between the turbine and the top level of water. power produced is propotional to hight. if hight is high water need is less and if hight decreses volume required will increse exponently. ref:power system operation and control by A.J.Wood.& B.Woolenberg. |
If you feel that you have found inappropriate content, please let us know by emailing us at answers-support@google.com with the question ID listed above. Thank you. |
Search Google Answers for |
Google Home - Answers FAQ - Terms of Service - Privacy Policy |